Strategic Investment Analysis for the Gas Station Projects Using Build Operate and Transfer (Case Study: PT Pertamina, Besakih Bali)
One of deployment planning from Pertamina is Besakih area in Bali. In this simple requirement, Pertamina need a further study to plan which type of gas stations will be implemented, COCO (Company Own Compant Operate) or DODO (Dealer Own Dealer Operate). COCO was found to be the viable option because DODO facing a major challenge based on the PESTLE and SWOT which is an issue related to government attitude towards greener technology such as electric vehicle. A several options for funding have been identified and well documented with several restrictions which are equity, loan, venture capital, and build operate transfer. If Pertamina need a new gas stations in terms of only 20% coming from capital (80% loan). Pertamina is not entitled to fund by venture capital as Pertamina is a state own company with rigid regulation. For the deployment of new gas station, the most expensive part is the land, therefore searching the solution through land funding is the most viable option. It was found that the strategy build, operate, and transfer (BOT) is a very interesting option. For the Pertamina, it erases the necessity for buying the land, on the other hand, for the land owner, it is better that their land could be useful for them in the next 15 years before they are getting all the facility transferred. The payback period is only 3,36 years with the IRR of 27,03% which is higher than the WACC. In case of Pertamina taking 80% loan and 20% equity, the NPV will return in the 5th year in start of the investment or 4th year in start of the operation. This strategy opens up new opportunities and solution for the business because it writes out land CAPEX necessity.