Financial Feasibility Study on Antam Pongkor Low-Grade Gold Ore Mine After Implementing Business-Level Strategy
The Pongkor Gold mine is under Production Operation Permit until 2031 while existing feasibility study stated that Pongkor gold Mine only have economical number until 2025 with ore volume in 1.5 million wmt and ore grades above 4 gpt. Pongkor Gold Mine has resources in low-grade gold ore (below 4 gpt) in 1.9 million wmt […]
