Abstract :
PTKPC, a coal producer, was facing challenges due to a permit transition in December 2021 from Coal Mining Contract of Work (PKP2B) to Special Mining Business License (IUPK). This change increases operational costs with added royalty rates, value-added tax, and profit-sharing obligations. To address this issue, the company decided to streamline contractors in each department in all business units, consolidating various tasks under one umbrella contract. The goal is to provide a big volume of work, potentially lowering rates and reducing PTKPC’s operational costs. However, relying on a single contractor for crucial operations, as seen in the Coal Terminal Maintenance Department (CTMD), introduces risks. The sole contract winner, PTPB, struggles to meet obligations since the contract’s initiation on December 1, 2021. The average contract fulfillment since commencement date is 86% of 100% desired target, disrupting fixed plant Coal Terminal maintenance activities. Physical availability is 93%, below the 94% target, increasing CTMD’s maintenance costs by $0.059 per ton. This research seeks to identify the root causes of PTPB’s inability to fulfill contractual duties and explore alternative solutions. and then from all the existing alternatives, what is the best alternative in responding to this condition. Utilizing primary and secondary data from PTPB’s monthly proforma invoices, contract scope, and CTMD’s monthly reports, the research employs methodologies like problem tree analysis and stakeholder analysis to unravel business complexities and identify root cause of the problems. Qualitative data collection methods, including focused group discussions (FGD) and semi-structured interviews, will be used to determine alternatives. These alternatives will be assessed using the Value-Focused Thinking (VFT) methodology. The Analytic Hierarchy Process (AHP) methodology, assisted by the AHP Super Decision application, will determine the best alternative: the “Implementation of Warnings and Penalties to PTPB”. Implementing this alternative demonstrates PTKPC’s commitment to stakeholders, ensuring contractor accountability without disrupting fixed plant maintenance. Penalty funds will support CTMD’s financial viability, funding additional resources for tasks beyond PTPB’s capacity. This strategy may be applied to other contracts within PTKPC.
Keywords :
AHP, Contractor, Problem tree, Super Decisions, VFT.References :
- A Leader’s Framework for Decision Making. (n.d.). Retrieved January 24, 2024, from https://hbr.org/2007/11/a-leaders-framework-for-decision-making
- Austin, J., & Mitchell, I. M. (2008). Bringing Value Focused Thinking to Bear on Equipment Procurement. Military Operations Research, 13(2), 33–46. http://www.jstor.org/stable/43920756
- BOARD OF DIRECTORS | PT. Bumi Resources Tbk. (n.d.). Retrieved January 24, 2024, from https://www.bumiresources.com/en/about-us/board-of-directors
- Company Overview – PT Kaltim Prima Coal. (n.d.). Retrieved January 24, 2024, from https://www.kpc.co.id/company-overview/
- Deddy P. Koesrindartoto. (2022, October). Capital Budgeting [PowerPoint slides]. School of Business and Management, ITB
- Dillon-Merrill, R. L., Parnell, G. S., Buckshaw, D. L., Hensley, W. R., & Caswell, D. J. (2008). Avoiding Common Pitfalls in Decision Support Frameworks for Department of Defense Analyses. Military Operations Research, 13(2), 19–31. http://www.jstor.org/stable/43920755
- Divergent Thinking Convergent Thinking. (n.d.). Retrieved January 24, 2024, from https://fosterwhatmatters.com/wp-content/uploads/2012/07/Divergent-Convergent-Model.pdf
- Freeman, R. E., & McVea, J. (2001). A Stakeholder Approach to Strategic Management. 0–32.
- History – PT Kaltim Prima Coal. (n.d.). Retrieved January 24, 2024, from https://www.kpc.co.id/history/
- Jenis-Jenis Perizinan Usaha Pertambangan Menurut UU Minerba | HeyLaw. (n.d.). Retrieved January 24, 2024, from https://heylaw.id/blog/jenis-jenis-perizinan-usaha-pertambangan-menurut-uu-minerba
- Kaltim Prima Coal | PT. Bumi Resources Tbk. (n.d.). Retrieved January 24, 2024, from https://www.bumiresources.com/en/about-us/subsidiaries/detail/kaltim-prima-coal
- Keeney, R. L. (1996). Value-focused thinking: Identifying decision opportunities and creating alternatives. European Journal of Operational Research, 92(3), 537–549. https://doi.org/https://doi.org/10.1016/0377-2217(96)00004-5
- Kepner-Tregoe, I. (1979). Problem Analysis and Decision Making. Kepner-Tregoe. https://books.google.co.id/books?id=LYHWAAAAMAAJ
- KPC 7 Values – PT Kaltim Prima Coal. (n.d.). Retrieved January 24, 2024, from https://www.kpc.co.id/kpc-7-values/
- Logullo, Y., Bigogno-Costa, V., da Silva, A. C. S., & Belderrain, M. C. (2022). A prioritization approach based on VFT and AHP for group decision making: a case study in the military operations. Production, 32, e20210059. https://doi.org/10.1590/0103-6513.20210059
- Marketing – PT Kaltim Prima Coal. (n.d.). Retrieved January 24, 2024, from https://www.kpc.co.id/marketing/
- Mendelow, A. L. (1981). Environmental Scanning-The Impact of the Stakeholder Concept. International Conference on Interaction Sciences. https://api.semanticscholar.org/CorpusID:8475799
- (n.d.). Retrieved January 24, 2024, from https://modi.esdm.go.id/produksi-batubara
- Novani, Santi. (2022, August). Strategic Decision Making & Negotiation MM5009: Multi Criteria Decision Making [PowerPoint slides]. School of Business and Management, ITB
- Novani, Santi. (2022, August). Analytic Hierarchy Process: Multi-criteria decision making [PowerPoint slides]. School of Business and Management, ITB
- Olander, S., & Landin, A. (2005). Evaluation of stakeholder influence in the implementation of construction projects. International Journal of Project Management, 23(4), 321–328. https://doi.org/https://doi.org/10.1016/j.ijproman.2005.02.002
- Operations – PT Kaltim Prima Coal. (n.d.). Retrieved January 24, 2024, from https://www.kpc.co.id/operations/
- Parnell, G. S., & Hill, R. R. (2008). Value-Focused Thinking and the Challenges of the Long War. Military Operations Research, 13(2), 5–6. http://www.jstor.org/stable/43920753
- Parnell, G. S., & West, P. D. (2008). KR23 Value-Focused Systems Decision Making. INCOSE International Symposium, 18(1), 1685–1699. https://doi.org/https://doi.org/10.1002/j.2334-5837.2008.tb00909.x
- Saaty, R. W. (1987). The analytic hierarchy process—what it is and how it is used. Mathematical Modelling, 9(3), 161–176. https://doi.org/https://doi.org/10.1016/0270-0255(87)90473-8
- Steps to Conducting a Focus Group Discussion (FGD). (n.d.). Retrieved January 24, 2024, from https://www.annmurraybrown.com/single-post/steps-to-conducting-a-focus-group-discussion-fgd
- Thunhurst, C., & Barker, C. (1999). Using Problem Structuring Methods in Strategic Planning. Health Policy and Planning, 14(2), 127–134. https://doi.org/10.1093/heapol/14.2.127
- Vision & Mission – PT Kaltim Prima Coal. (n.d.). Retrieved January 24, 2024, from https://www.kpc.co.id/vision-mission/
- What is Mendelow’s Matrix and Why Is It Useful For Marketers? (n.d.). Retrieved January 24, 2024, from https://blog.oxfordcollegeofmarketing.com/2018/04/23/what-is-mendelows-matrix-and-how-is-it-useful/
- Zhang, C., Zhao, Y., Lu, J., Li, T., & Zhang, X. (2021). Analytic hierarchy process-based fuzzy post mining method for operation anomaly detection of building energy systems. Energy and Buildings, 252, 111426. https://doi.org/https://doi.org/10.1016/j.enbuild.2021.111426