Integrative Negotiation Framework Case Study: “RUMAH DINAS TNI-AD-SBSN 2021 Project in CIRACAS”

WIKA WG KSO is a joint company between PT. WIKA and PT. WEGE, which is engaged in the construction sector, is a temporary limited liability company that was deliberately built to complete the TNI-AD RUMDIS project which is located in 36 areas in Indonesia. One of the project areas is in Ciracas, East Jakarta, which was chosen by the author as the research subject. The location of the research project is in a residential area, so the construction process is carried out in the same place as the community’s activity and mobility area, which in turn raises several issues and criticisms.

The purpose of this research is to analyze the problem solving conducted by PT. WIKA WG KSO, the process taken, until the results obtained from solving problems that have been carried out, as well as to identify alternative methods that can be carried out by PT. WIKA WG KSO to get the best results. The author proposes the interactive negotiation method as a recommendation to achieve a win-win solution that is fair for both parties.

Based on the research that has been done, the authors conclude that there are several methods of integrative negotiation that can be carried out by PT. WIKA WG KSO to achieve a fair and profitable end result for PT. WIKA WG KSO and local residents affected by the TNI-AD RUMDIS development project.