Abstract :
The distribution system is a component of the electric power system responsible for delivering electricity from the transmission network to consumers. This system generally utilizes medium voltage levels, which are more susceptible to faults compared to transmission systems. To mitigate disturbances in the distribution network, protection equipment is employed. Commonly used protection devices include the Overcurrent Relay (OCR) and the Ground Fault Relay (GFR). Coordination between the OCR and GFR is essential to ensure the protection system functions optimally, possesses adequate selectivity and sensitivity, and maintains the continuity of electricity supply. This paper discusses the coordination settings of the overcurrent and ground fault relays. Simulations were conducted using ETAP 19.0.1 software based on field data. Calculation results on the feeder indicate an OCR grading time of 0.489 seconds, whereas the field data shows 0.4 seconds. For the GFR, the grading time on the feeder is 0.297 seconds, compared to 0.4 seconds from the field data. These values indicate that the protection coordination within this system can be considered ideal.
Keywords :
ETAP 19.0.1, Ground fault relay, Overcurrent relay, Protection coordinationReferences :
- Adzin, “Coordination Analysis of Overcurrent Relay (OCR) and Ground Fault Relay (GFR) in 20 kV Medium Voltage Power Distribution Systems (Case Study at PT. PLN (Persero) ULP Sidareja),” Universitas Peradaban Library, 2022. Accessed: Nov. 01, 2024.
- El, Joko Joko, T. Rijanto, and T. Wrahatnolo, “Testing of Overcurrent and Ground Fault Relay Coordination as Protection and Safety Measures in 20 kV Cubicles in Electric Power Distribution Systems,” Scientica: Scientific Journal,
- Thaha, A. W. Indrawan, and Y. J. Pongkiding, “Analysis of the Protection Coordination System for Overcurrent Relay (OCR) and Ground Fault Relay (GFR) on the 20 kV Transformer Bay at Sanga-Sanga Substation, East Kalimantan,”
- Andriyan, Nasrulloh, and R. Murdiantoro, “Analysis of Coordination of Overcurrent Relay (OCR) and Ground Fault Relay (GFR) on the 20 kV Distribution System: A Case Study at PT. PLN (Persero) ULP Sidareja,
- M. Siburian, T. Siahaan, and J. Sinaga, “Analysis of 20 kV Distribution Network Performance Improvement Using Thermovision Method on the Network of PT. PLN (Persero) ULP Medan Baru,” Uda Energy Technology Journal: Journal of Electrical Engineering, vol. 9, no. 1, pp. 8–19, 2020. Accessed: Nov. 18, 2024. [Online].
- D. Paminto and A. Kiswantono, “Simulation Design of Overcurrent Relay System on 20 kV Distribution Networks,” Aisyah Journal of Informatics and Electrical Engineering (A J I E E), vol. 3, no. 1, pp. 45–49, Feb. 2021.
- Y. Imanuddin and F. Achmad, “Design of Power Distribution Protection System for the Kyo Apartment Project at PT. Alkonusa Teknik Interkon,” Journal of Education and Counseling (JPDK), vol. 5, no. 1, pp. 1633–1639, 2023.
- Sarimun N., Technical Services Pocket Book, 2nd ed. Depok, Indonesia: Garamond, 2011.