Abstract :
Electricity is a fundamental need that supports modern life across household, industries, and public sector. To ensure the sustainability of electricity in Java and Bali, PT GSE,a Geothermal Power Plant in Pengalengan, West Java, conduct a base structure replacement project for cooling tower which innitialy using the wooden base structure into the Fibre Reinforced Polymer (FRP). This project, known as Project X, was executed by PT XYZ as the EPC contractor. During the execution, cooling tower unit – 1 faced significant delay, posing financial and reputational risks. This research aims to identify the root causes of the delay, evaluate the losses, and proposed solutions for time and cost efficiency using the project crashing method. This research combine interview with key personnel and secondary company data. The critical path analysis conducted by using the Activity on Node (AON) approach, activity mapping using Precedence Diagram Method (PDM), and calculation for additional cost due to overtime conducted by using minimum wages (UMK) for Kabupaten Bandung in 2025. S Curve analysis shows 10 weeks of delay, mainly due to frequent bad weather that prevented outdoor activities according to the HSSE policies. Financially, if there is no corrective action to handle the delay, PT XYZ would be subjected to a project penalty of Rp 2.734.770.052, as stipulated in the cooperation contract with PT GSE. To anticipate the losses, the proposed solution is project crashing by conducting overtime to the critical path activites, which is safer dan more efficient comparing to adding new additional resources. The implementation of project crashing calculated need extra funding about Rp 399.544.839 which only 14,61% compared to the potential penalty sanction. Beyond the financial impact, this strategy also maintains client trust and strengthen future business opportunities.
Keywords :
Construction., Overtime, PLTP, Project Crashing, Project Delay, Project ManagementReferences :
- Abuhasel, K. (2023). Sustainable Green City Development Project Analysis using the Critical Path Method (CPM) and the Crashing Project Method on Time and Cost Optimization. Engineering, Technology and Applied Science Research, 13(3), 10973–10977.
- Alnavis, N. B., Wirawan, R. R., Solihah, K. I., & Nugroho, V. H. (2024). Energi listrik berkelanjutan: Potensi dan tantangan penyediaan energi listrik di Indonesia. Journal of Innovation Materials, Energy, and Sustainable Engineering, 1(2), 119–139.
- Baratta, A. (2006). The Triple Constraint, A Triple Illusion. 2006 PMI Global Congress Proceedings.
- Bintang, M. R., Sungkono, K. R., & Sarno, R. (2019). Time and Cost Optimization in Feasibility Test of CCTV Project using CPM and PERT. 2019 International Conference on Information and Communication Technology (ICOIACT), 678–683.
- Currie Siregar, A., Noorkhayati, N., Yatnikasari, S., Aprisandi, D., & Agustina, F. (2024). Optimization of Time Scheduling Planning with the Precedence Diagram Method (PDM) on the Drainage Construction Project. TEKNIKA: JURNAL SAINS DAN TEKNOLOGI, 20, 124–131.
- Ervianto, W. I. (2023). Manajemen Proyek Konstruksi (L. Mayasari, Ed.). ANDI.
- Fazis, M., & Tugiah. (2022). Perencanaan Proyek dan Penjadwalan Proyek. Jurnal Sosial Dan Teknologi, 2, 1365–1377.
- Heizer, Jay., Render, Barry., & Munson, Chuck. (2020). Operations management : sustainability and supply chain management. Pearson.
- Kartini, L., Abdullah, Riauwati, J., Yoeliastuti, Tannady, H., Khasanah, Batubara, H. C., Kamisi, H. la, Liana, W., & Purbaningsih, Y. (2022). Manajemen Proyek (P. T. Cahyono, Ed.). Cendikia Mulia Mandiri.
- Kurniawan, A. (2021). Pembahasan Lengkap Cooling Tower. Teknik Elektro.
https://www.teknikelektro.com/2021/08/cooling-tower.html
- Li, K., Zelbst, P., & Shao, B. (2012). Project Crashing Using Excel Solver: A Simple AON Network Approach. International Journal of Management & Information Systems-Second Quarter, 16(2), 177–182.
- Pinto, J. K., York, N., Francisco, S., & Kong, H. (2020). Project Management Achieving Competitive Advantage (Global). Pearson.
- Project Management Institute. (2017). Guide to the Project Management Body of Knowledge (PMBOK Guide) (6th ed.). Project Management Institute.
- PT PLN (Persero). (2021). Rencana Usaha Penyediaan Tenaga Listrik (RUPTL) 2021–2030. PT PLN (Persero).
- Ridlo Al-Hakim, R. (2020). Model Energi Indonesia, Tinjauan Potensi Energi Terbarukan Untuk Ketahanan Energi Di Indonesia: Sebuah Ulasan. ANDASIH Jurnal Pengabdian Kepada Masyarakat, 1(1), 11–21.
- Romadhona, S., Kurniawan, F., & Tistogondo, J. (2021). Project Scheduling Analysis Using the Precedence Diagram Method (PDM) Case Study: Surabaya’s City Outer East Ring Road Construction Project (Segment 1). International Journal of Engineering, Science and Information Technology, 1(2), 53–61.
- Sha Putri Anugerah, Z., Pratami, D., & Deni Akbar, M. (2021). Designing project schedule using crashing method to compress the fiber to the home project schedule. International Journal of Industrial Optimization, 2(1), 51–62.
- Sulistyo, A. B., & al Fikri, M. (2021). Analisis Optimalisasi Waktu dan Biaya Proyek Konstruksi Menggunakan Metode Time Cost Trade Off (Studi Kasus: Proyek Pembangunan Jalan Gorda-Bandung). Jurnal InTent, 4(1), 25-40.
- Tamalika, T., & Fuad, I. S. (2022). Analisis Penjadwalan Waktu Pekerjaan Proyek Poltekkes Jurusan Farmasi Tahap I dalam Perspektif Manajemen Proyek. Jurnal Pendidikan Tambusai, 6(1), 8027–8214.
- Ervianto. (2006). Manajemen Proyek Konstruksi (Revision Edition).
- Yang, Z., & Wang, Z. (2010). Comparison between AON and AOA Network Diagrams. 2010 IEEE 17th International Conference on Industrial Engineering and Engineering Management, 1507–1509.
- Zareei, S. (2018). Project scheduling for constructing biogas plant using critical path method. Renewable and Sustainable Energy Reviews, 81, 756–759.