Abstract :
This research evaluates the performance of fuel distribution services by PT AAA at Terminal X, focusing on meeting the operational target of 14 hours per day. The average service level during the assessment period was 56%, revealing a significant operational gap of 44% exceeding the target due to delays in truck refueling attributed to long queues, administrative processes, and technical disruptions. By analyzing data with the SIOD application and employing the 5 Whys method for root cause analysis, delays in refueling trucks, exceeding contract targets by 20%, were identified. Reducing refueling time could save PT BBB, a stakeholder, IDR 574 million annually in overtime expenses and mitigate worker fatigue and incidents during late-night work. Practical recommendations include improving operational hours, efficiency, and safety by identifying constraints and defects to align with target operational time in contractual obligations between PT AAA and PT BBB.
Keywords :
Cycle Time, Flow Process, Flowtime, Fuel Distribution, Service LevelReferences :
- Pertamina ( Persero ). 2016. Buku Panduan Volume 2- Manajemen Operasi. Jakarta PT Pertamina (Persero)
- Jacobs, F. Robert, Richard B. Chase, and Rhonda R. Lummus. Operations and supply chain management. New York, NY: McGraw-Hill/Irwin, 2014.
- Sutherland, J., & Bennett, B. (2007). The seven deadly wastes of logistics: applying Toyota Production System principles to create logistics value. Lehigh University Center for Value Chain Research, January 2007, 1–9.
- Ohno,T. (1988). Toyota Production System : Beyond Large-Scale Production. NY: Doubleday & Company,Inc.
- Andersen, B., & Fagerhaug, T. N. (2006). Root cause analysis: Simplified tools and techniques (2nd ed.). Milwaukee, WI: American Society for Quality, Quality Press.
- White Stephen (2004). Introduction to BPMN. IBM Corporation. www.bptrends.com
- Morgan,James M. (2006). The Toyota Product Development System : Integrating people,process,and technology. United States Government Work
- Koskela, Lauri, Sacks, R. and Rooke, John (2012) A brief history of the concept of waste in production. In: IGCL 20, 18th-20th July 2012, San Diego, California, USA.
- Maulana, S., Salsabiela, M., & Sutangi, S. (2017). the Implementation of Risk Assessment At Filling Fuel Work in Filling Shed Area. Jurnal Migasian, 1(2), 28–35. https://doi.org/10.36601/jurnal-migasian.v1i2.13