Abstract :
In the midst of production process to fulfilling the needs of n2 vaccine, several problems occur and cause the production process to be hampered. The high frequency of breakdowns that occurred became problems that results in longer production process and some products become rejected and cannot be absorbed as a whole to meet the production needs. Preventive maintenance that have been conducted so far are considered not optimal because there are more breakdown maintenance than preventive maintenance. History of the breakdown shows that 35% of the total number of production batches experiences failure of the machine in the production process experiences failure of the production process. The results of the study using quantitative analysis show that the OEE of the integrated Filling Machine is only 55%, far below the ideal OEE standard of 95%. A qualitative analysis also conducted to further explores the cause of the bottlenecks in the production process which involves the production and maintenance unit.
Study and analyses are conducted to find the root cause of high disturbances that results in losses and obstacle to production process. By using current reality tree, found that the main cause of the bottleneck in the production process on the high number of the breakdown in the Integrated Filling Machine is lack in maintenance activity which the preventive maintenance that conducted doesn’t have clear procedure then coupled with the maintenance team’s habit that prefer to work in breakdown maintenance than preventive maintenance.
To solve the problem three alternative solutions are prepared to be choose. The alternative solutions are Autonomous Maintenance, Planned Maintenance, and Principal’s service agreement. All of the alternative solution is selected with consideration of production needs with their respected advantages and disadvantages. Of the three alternative solutions provided, Analytical Hierarchy process will be conducted to determine which alternative is more likely to be implemented. Planned maintenance was chosen as the best solution that meet the needs of each stakeholder with the most mitigable risks and has advantages that can solve the problems that occur.
Keywords :
analytical hierarchy process, Integrated Filling Machine, n2 Vaccine Production, Overall Equipment Effectiveness, Planned maintenanceReferences :
- Assauri, S., 2008, Manajemen Produksi dan Operasi. Jakarta: Fakultas Ekonomi, Universitas Indonesia
- Bleakley, A., 2005, Stories as Data, Data as Stories: Making Sense of Narrative Inquiry in Clinical Education
- Corder, A., 1992, Teknik Manajemen Pemeliharaan. Jakarta: Erlangga
- Davenport, T. H. & Lawrence Pusak, 1998, Working Knowledge: How Organizations manage what they know. Boston: Harvard Business School Press
- Ernawanto, 2018, Implementation of World Class Maintenance Management in PT Krakatau Daya Listrik in Order to Increase Electrical Power Reability Supply to Customer
- Fadhila, A., 2019, “Total Productive Maintenance Analysis on A380 Parts”
- Fatma, N. F., Ponda, H., & Kuswara, R. A., 2020, Analysis Preventive Maintenance dengan metode Menghitung Mean Time Between Failure (MTBF) dan Mean Time To Repair (MTTR)
- Hedge, Harsha G., N.S. Mahesh, K. Doss, 2009, Overall Equipment Effectiveness Improvement by TPM and 5S Techniques in a CNC Machine Shop. Vol 8 (2):25-32
- Huang, S. H., 2003, Manufacturing productivity improvement using effectiveness metrics and simulation analysis, International Journal of Production Research, 41(3): 513-527
- Jonsson, P., & Lesshamar, M., 1999., Evaluation and Improvement of manufacturing performance measurment systems- the role of OEE, International Journal of Operations & Production Management, 19(1):55-78
- Kurniawan, F. A., 2013, Analisa RPN (Risk Priority Number) Terhadap Keandalan komponen mesin kompressor double screw menggunakan metode FMEA di pabrik semen PT XYZ
- Kurniawan, R. A., & H. M. Kholik, 2017, Usulan Perawatan Mesin Stiching dengan metode reability centered maintenance,
- Tek. Ind., Vol 16, no 2, p. 83, doi:10.22219/ktiumm.vol16.no2.83-91
- Merriam, S. B., 2009, Qualitative research: A guide to design and implementation. San Francisco, CA: Jossey-Bass.
- Nakajima, S., 1988, Introduction to Total Productive Maintenance, Portland OR, USA: Productivity Press, Inc
- Nonaka, I. & Teece, D. J., 2001, Managing Industrial Knowledge. London: SAGE Publication, L.td
- Nugraha, A. A., 2021, Customer Segmentation and Preference modelling of Indonesian Mobile Telecommunication Industry: A data Mining Approach
- Osada, T., 1991, The 5S’s: Five Keys to a Total Quality Environtment, Tokyo, JP: Asian Productivity Organization
- Pasaribu, M., 2009, Knowledge Sharing. Meningkatkan Kinerja Layanan Perusahaan. Jakarta: PT Elex Media Komputindo
- Patrick, M. K., & Nasiru, S., 2013, Prediction Customer Preference of mobile service using neural network. Information and Knowledge Management. Vol. 3, No. 12, 2013
- Prayogo, A. B., 2017, Penerapan Knowledge Management untuk pencapaian Visi dan Misi pada PT Pertamina
- Rasib, A.H.A., Ebrahim, Z., Abdullah., Rafaai, Z.F.M, 2019, Improvement of Overall Equipment Effectiveness through application of single-minute exchange of die in automative manufacturing, TEST Engineering and Management, 81:36503659
- Revitasari, C., Novareza, O., Darmawan, Z., 2015, Penentuan Jadwal Preventive Maintenance Mesin-mesin di Stasiun Gilingan (Studi Kasus PG. Lestari Kertosono)
- Ross, K., 2006, Examining the process of RCM and TPM: What do they ultimately and are two approaches compatible?. Article centre for TMP (Australia)
- Sidabutar, D., 2019, Implementation of Total Productive Maintenance in PT IP Lontar
- Singh, R., Gohil, A.M., Shah, D.B., Desai S., 2012, Total Productive Maintenance (TPM) implementation in a Machine shop:a case Study, Procedia Engineering, 51(2013):592-599
- Sugiyono, 2011, Metode Penentuan Kuantitatif kualitatif dan R&D, Bandung: Alfabeta
- Sulanjari. P., % Firman A., 2012, Effective Implementation of lean manuafacturing in PT Kalbe Farma Tbk. The Indonesian Journal of Business Administration. Institut Teknologi Bandung
- Venkatesh. J., 2007, An Introduction to Total Peoductive Maintenance (TPM)
- Zikmund, William G., 2013, Business Research Methods (9th). USA: South-Western Cengage Learning