Abstract :
The healthcare service system in Indonesia is divided into two levels, first-level healthcare services, and advanced-level healthcare services. One of the first-level healthcare services is the small public health facility or clinics. The healthcare system in Indonesia requires patients to seek treatment at a first-level health care system first and prohibits seeking treatment at an advanced-level healthcare system unless emergency or necessary. However, research on the performance management system for clinics is still very minimal. This research is intended to design a performance management framework using Clinic T in City B, Indonesia, as a case study. The flow of research methodology in this study is started with problem identification, continued with framework selection analysis. The selected framework in this study is the Knowledge-Based Performance Management System (KBPMS). Performance framework for Clinic T and the performance indicators are presented, along with the linkage between performance variables and one of the simple ways to show the clinic’s performance for easier evaluation. The proposed framework is expected to be suitable for other clinics in Indonesia and can be used as a foundation for other clinics in designing their own performance management framework.
Keywords :
Clinics, Healthcare, KBPMS, Management System, Performance Framework.References :
1. Wheelen, T., & Hunger, J. (2006). Strategic Management and Business Policy (10th ed.). Pearson Prentice Hall. New Jersey, 10th edition.
2. Armstrong, M. (2006). Performance Management: Key Strategies and Practical Guidelines (3rd ed.). Kogan Page Ltd. Philadelphia, 3rd edition.
3. Skinner, W. (2002). Missing the link in manufacturing strategy, in Voss, C. A. (1992). Manufacturing Strategy: Process and Content, Chapman & Hall. London.
4. Kaplan, R. S. (1983). Measuring Manufacturing Performance: A New Challenge for Managerial Accounting Research. The Accounting Review.
5. Cooper, W. K., Kingshuk K. S., and Robert, S. S. (1992). Measuring complexity in high-technology manufacturing: indexes for evaluation. Interfaces.
6. Wibisono, D. (2016). How to Create World Class Company: Panduan Bagi Direktur dan Manajer, Penerbit ITB. Bandung, 2nd edition.
7. Lunger, K. (2006). Why You Need More Than a Dashboard to Manage Your Strategy. Business Intelligence Journal.
8. Stoop, P. P. M. (1996). Performance management in manufacturing: a method for short term performance evaluation and diagnosis. Unpublished PhD Thesis, Technische Universiteit Eindhoven.
9. Kaplan, R. S. and Norton, D. P. (1996). The Balanced Scorecard: Translating Strategy into Action, Harvard Business School Press. Boston.
10. Neely, A., Adams, C., Crowe, P. (2002). The Performance Prism – The Scorecard for Measuring and Managing Business Success, Pearson Education Limited. London.
11. Fatima, I., Wibisono, D., & Adhiutama, A. (2019). Conceptual Framework of Performance Management System for Construction Companies in Indonesia. International Journal of Innovative Technology And Exploring Engineering (IJITEE).
12. Aquilano, N. J., Chase, R.B., Jacobs, F. R. (2004). Operations Management for Competitive Advantage. McGraw-Hill. Boston.
13. Basu, R., and Wright, N. J. (1997). Total Manufacturing Solutions, Butterworth-Heinemann. Oxford.
14. Hooley, G.J., and Saunders, J. (1993). Competitive Positioning: The key to market success, Prentice Hall International.
15. Roth, A.V., Giffi, C. A., Seal, G. M. (1992). Operating strategies for the 1990s: elements comprising world-class manufacturing, in Voss, C. A. (1992). Manufacturing Strategy: Process and Content, Chapman & Hall. London.