Abstract :
This study aims to enhance the quality of the Foley catheter assembly section at PT XYZ, an Indonesian medical device manufacturer, using Six Sigma methodology. PT XYZ currently faces an 8% defect rate in its Foley catheter assembly section, surpassing the acceptable 3% threshold. The current Sigma level of the Shrink process within the assembly section is 2.36, while the Balloon Vulcanizing and Assembly process stands at 2.68. The Six Sigma DMAIC (Define, Measure, Analyze, Improve, Control) framework was used to identify and address root causes of defects. Data collection methods included interviews, questionnaires, and field observations, revealing key issues such as incorrect tray loading, machine calibration errors, operator skill variability, and inadequate handling techniques. Proposed improvements include updating Standard Operating Procedures (SOPs), implementing SCAMPER for calibration, comprehensive training programs, and incentive schemes. Additional measures involve template overlays for precise cutting, vendor maintenance, and control charts for consistency. The Control phase ensures sustainability through documentation, training, and monitoring using control charts and Failure Modes and Effects Analysis (FMEA). Implementing these solutions is expected to reduce the defect rate and elevate the Sigma level of both processes to 3, enhancing process efficiency and product quality. This will improve operational efficiency and customer satisfaction, providing a robust framework for PT XYZ to elevate its quality control and contribute to better healthcare device manufacturing in Indonesia.
Keywords :
DMAIC, Foley catheters, Medical Device, Quality Improvement, Six Sigma.References :
- 16 Fr 24Fr Produk Sekali Pakai Medis Karet Silikon Lateks Foley Balloon Catheter 2 Cara. (n.d.) Indonesian.medicaldisposable-Products.com. Retrieved on June 22, 2024, from https://indonesian.medicaldisposableproducts.com/sale-32463850-16-fr-24fr-medical-disposable-products-silicone-rubber-latex-foley-balloon-catheter-2ways.html
- Akhtar, I. (2016). Research Design. SSRN Electronic Journal.
- American Society for Quality. (2024). Total Quality Management (TQM): What is TQM? Retrieved on March 11, 2024 from https://asq.org/quality-resources/total-quality-management
- Angrosino, M.V. (2005). Recontextualizing Observation: Ethnography, Pedagogy, and the Prospects for a Progressive Political Agenda.
- Arredondo-Soto, K., Realyvásquez-Vargas, A., Guadalupe Hernández- Escobedo, Luis, J., Alcaraz, G., & Cuauhtémoc Sánchez Ramírez. (2023). Production Capacity Increase in Medical Device Manufacturing Assembly Lines.
- Centers for Disease Control and Prevention. (2019). Recommendations. Centers for Disease Control and Prevention. https://www.cdc.gov/infectioncontrol/guidelines/cauti/recommendations.html
- Chinosi, M., & Trombetta, A. (2012). BPMN: An introduction to the standard. Computer Standards & Interfaces, 34(1), 124–134
- Chovancová, M., & Stopka, O. (2017). MODELING THE “ CURRENT REALITY TREE ” DIAGRAM IN THE CONTEXT OF INDUSTRIAL LOGISTICS FOR DETERMINATION OF SYSTEM CONSTRAINTS.
- CPAKB | Maxlean Consulting. (n.d.). Maxlean Consulting. Retrieved on April 17, 2024, from https://www.isomanajemen.com/cpakb/
- Crosby, P. B. (1980). Quality is Free. Signet Book.
- Dalton, J. (2018). Project (Team) Chartering. Great Big Agile.
- Dawson, A. (2019). A Practical Guide to Performance Improvement: Beginning the Process. AORN Journal, 109(3), 318– 324.
- Farizal Rizky Muharram, Andrianto Andrianto, Senitza Anisa Salsabilla, El, C., Wigaviola Socha Harmadha, Dakota, I., Hananto Andriantoro, Firman, D., & Radityo Prakoso. (2023). Catheter Laboratory Facilities in Indonesia: Number, Growth, and Distribution in The Largest Archipelago Nation. MedRxiv (Cold Spring Harbor Laboratory).
- Hayes, D. S. (2000). 1999 International Student Paper Award Winner: Evaluation and Application of a Project Charter Template to Improve the Project Planning Process. Project Management Journal, 31(1), 14–23.
- Irayanti Adriant,Irayanti. (2023). Quality Perspectives [PowerPoint slides]. Lectures at Institut Teknologi Bandung
- Jadhav, H.L., Urgunde, K.R., & Pawar, A.J. (2014). TECHNOLOGY POKA -YOKE
- Kannaraya, P. S., Shreya, G. H., Arora, M., & Chakrabarti, A. (2022). Impact of Smart Incoming Inspection System on the Production, in a Medical Device Manufacturing MSME. Lecture Notes in Mechanical Engineering, 157–165.
- Kumar, U. (2008). Six Sigma — Status and Trends. Springer EBooks, 225–234.
- Kumar, V., Verma, P., & Muthukumaar, V. (2018). The Performances of Process Capability Indices in the Six-Sigma Competitiveness Levels.
- Kurhade, A.J. (2015). ON “ POKA-YOKE : TECHNIQUE TO PREVENT DEFECTS ”.
- Manner, B. M. (1995). Field Studies Benefit Students and Teachers. Journal of Geological Education, 43(2), 128–131.
- Milind Shrikant Kirkire, & Abhyankar, G. (2023). Medical Product Manufacturing Process Capability Improvement Using Six Sigma–DMAIC Methodology. Lecture Notes in Mechanical Engineering, 215–230.
- Montgomery, D. C., & Woodall, W. H. (2008). An Overview of Six Sigma. International Statistical Review, 76(3), 329– 346.
- Nicolle, L. E. (2014). Catheter associated urinary tract infections. Antimicrobial Resistance and Infection Control, 3(1).
- Nilesh H. Khandare et al., N. H. K. et al.,. (2018). An Elimination Type of Pokayoke- A Game Changer Tool in the Propeller Shaft Assembly. International Journal of Mechanical and Production Engineering Research and Development,8(5),223–232.
- Piccirillo, I.N., Da Silva, S.L., Amaral, D.C., & Ferreira, E.B. (2022). Diagnosing project management in a research center using the current reality tree method / Diagnóstico da gestão de projetos em um centro de pesquisa usando o método atual de árvore de realidade. Brazilian Journal of Development.
- Pyzdek, T. (2003). The Six Sigma Handbook, Revised and Expanded. McGraw-Hill Companies.
- Qu, S. Q., & Dumay, J. (2011). The Qualitative Research Interview. Qualitative Research in Accounting & Management, 8(3), 238–264.
- Rachmawati, I. N. (2007). Pengumpulan Data Dalam Penelitian Kualitatif: Wawancara. Jurnal Keperawatan Indonesia, 11(1), 35–40.
- Robinson, H. (2011). Using Poka-Yoke Techniques for Early Defect Detection.
- Ruecker, S., & Radzikowska, M. (2008). The iterative design of a project charter for interdisciplinary research. Proceedings of the 7th ACM Conference on Designing Interactive Systems – DIS ’08.
- Sherman, A., Vilaro, J., & Schulman, A. (2020). Retained Urethral Foley Catheter: A Rare Cause of Total Incontinence After Transurethral Resection of the Prostate. Journal of Endourology Case Reports, 6(1), 1–3.
- Singh, M., & Rathi, R. (2023). Implementation of environmental lean six sigma framework in an Indian medical equipment manufacturing unit: a case study. The TQM Journal. https://doi.org/10.1108/tqm-05-2022-0159
- Theory of Constraints: Using a Current Reality Tree» Optimal Service Management. (n.d.). Retrieved on May, 18 2024 from https://www.optimalservicemanagement.com/blog/theory-of-constraints-using-a-current-reality-tree/
- Vandyshev, D.R., Kulemin, A.N., & Nachalov, D.S. (2020). Identification of Information System Functional Problems Using the Model of Requirements and Cause-effect Relationships. KnE Engineering.
- Völzer, H. (2010). An Overview of BPMN 2.0 and Its Potential Use. Lecture Notes in Business Information Processing,14-15.
- Walker, E. D., & Cox, J. F. (2006). Addressing ill‐structured problems using Goldratt’s thinking processes. Management Decision, 44(1), 137–154.