Abstract :
Electrical construction company that experienced in making Well Head Control Panels (WHCP) has difficulties to decide acceptance of investment in WHCP contracts raised with their client in upstream oil and gas company. The difficulty mostly due to uncertainty of client well drilling sequence. The electrical construction company need to financial investment analysis includes material purchasing, shipping, fabrication and delivery of WHCPs need to be done to make sure they make a profit. It is crucial for electrical construction company used correct forecasting method to determine schedule of client’s request. Monte carlo forecasting method is used to predict the well drilling sequence. The well drilling sequence data for 12 months is used to determine 24 months well drilling sequence operation with result 179 wells with normal distribution and 167 wells with triangular distribution.
Keywords :
Investment analysis, Monte Carlo Simulation, Well Drilling SequenceReferences :
- Bahagiarti K. Sari. (2007). Eksistensi Kebumian, Pemanasan Global dan Pengelolaan Sumber Daya Alam. Prosiding Seminar Nasional. Universitas Pembangunan Nasional Veteran Yogyakarta. Yogyakarta.
- Fathaddin, M.T, & Riswati S.S. (2021). Penerapan Metode Monte Carlo Untuk Perkiraan Cadangan Reservoir Hidrokarbon dan Panas Bumi. Nasmedia. Yogyakarta.
- Rahmat, S. (2001). Simulasi Monte Carlo dan Analisis Resiko Untuk Pengembangan Lapangan Minyak Bumi. Institut Teknologi Bandung. Bandung.
- Supranto, J. (1988). Statistik: Teori dan Aplikasi (Edisi Kelima). Penerbit Erlangga. Jakarta
- Williamson, H.S. SPE, Sawaryn, S.J., & Morrison, J.W. (2006). Monte Carlo Techniques Applied to Well Forecasting: Some Pitfalls. Society of Petroleum Engineers.
- Wilson, Holton J. & Barry Keating. 2002. Business Forecasting with accompanying Excell Based ForecastX Software.4th McGraw-Hill.